Find the waste.
Review bills, inspect systems and measure use. Agree the baseline before making changes.
Resource efficiency for buildings in Malaysia
REEF finds wasted energy and water, designs the improvements and helps your team deliver them. Clear investment decisions. Measured results.

01 / Measured results
Allianz Malaysia · Commercial offices
Lighting, air-conditioning and equipment schedules. Targeted improvements across 13 floors in three towers at Allianz Malaysia.
The reduction appeared on the next electricity bill.
Historical averages accepted by the client’s finance team following a load-per-person review. Results depend on each building’s operating conditions.

02 / How we work
We turn utility data and site measurements into a costed plan, then stay involved through implementation and monitoring.

Review bills, inspect systems and measure use. Agree the baseline before making changes.
Compare estimated savings, investment and payback. Make the assumptions visible.
Support your team and contractors through installation, commissioning and operating changes.
Track performance against the baseline, accounting for occupancy, weather and operating changes.
03 / Our expertise
Cooling releases heat that hot-water systems can use. Water demand affects treatment loads. We assess the connections before recommending equipment.

Tune air-conditioning and ventilation (HVAC), lighting and building controls. Reduce unnecessary running hours and assess targeted upgrades.
Find the opportunity
On-grid and off-grid systems assessed around demand, roof space and connection requirements.

Water efficiency, rainwater harvesting, filtration and treatment systems.
Reduce waste at source, improve separation and assess recovery options. Build the changes into daily operating routines.
04 / Ways to work together
Choose the improvements and the support you need. Agree responsibilities, scope and fees before work starts.
Design, supplier coordination and on-site support to put the agreed improvements into operation.
Prioritised recommendations, estimated costs and clear specifications for your own team or appointed contractors.
Plan the assessmentFinancing options may be explored for eligible projects, including shared savings and third-party solar agreements.
Availability and terms depend on technical and commercial assessment, with third-party approval where required.
05 / Selected projects
Explore the scope of our work in Malaysia, from resource assessments to integrated energy and water systems.

Solar generation and rainwater collection, storage and filtration for an educational space.
View project
Sustainability assessment and management planning. Presented for its advisory scope.
View project
Solar, rainwater, greywater reuse and on-site treatment brought together in community buildings.
View projectNirvahana Farm, Laos — solar energy, rainwater harvesting, greywater reuse and constructed wetlands.
06 / People, not just proposals
Rubén attends project discussions personally, supported by engineering and commercial specialists.

Building efficiency, resource management and project delivery.
LinkedIn — Rubén Cortés (opens in a new tab)
Mechanical and environmental engineering, resource conservation and pollution prevention.
LinkedIn — Patricio Gonzalez (opens in a new tab)
Energy policy, ASEAN affairs, corporate communications and stakeholder management.
LinkedIn — Gerald Tan (opens in a new tab)The experience behind the work
Mechanical & environmental engineering
Energy & water efficiency
Building operations & project management
07 / Let’s talk about your building
Tell us what you operate and where costs or system performance need attention. We’ll discuss the right assessment scope.